Noveber 2020

 

we're back

 

We're back but we will be revisiting the projects and images on this website over the next month or two.

We'll also be adding a page on Instagram so that you can see what we're up to, what inspires us and what's coming up!

 

For now, we're giving you a taste of what we're working on now and what we're hoping to develop over the coming months into 2021, which we hope will be a better, healthier world for all of us.

 

 

What are we working on?

 

South Gloucestershire

Work has just started on site to convert a large stone built double garage and adjoining former stabling in to a live in annex with new oak trusses, woodfibre insulation and lime plaster finishes.

 

Bristol

Following a lengthy but successful planning approval for an additional one bedroom flat on top of an existing 2 storey residential building, the building regulations drawings are now with structural engineers to design the essential framing to support the new timber framing for the envelope.

 

Wiltshire

Construction is underway of a new floating yoga studio and bespoke garage for a private client

 

South Gloucestershire

We are currently working with clients to develop extensions and undertake re-modelling of a grade II listed house, with the works to include the removal of upvc windows and a flat roof lean to, and to put back a sympathetic contemporay extension to reflect a major element of the existing building, re-model part of the adjacent interior and add a new garden room / home office to replace the flat roof addition.

 

South Gloucestershire

Work is underway to prepare a planning application to remove surplus farmyard structures and convert a couple of single storey former farm buildings in to a single family dwelling in the countryside with landscape and ecology enhancements

 

Bristol

A planning application has been submitted to add a first floor to an existing single storey dwelling to the rear of existing commercial premises with a new timber frame and cladding with an elevated private amenity/ garden space, creating a tight urban development providing additiona affordable rental property.

 

Bristol

Early design works and discussion with clients and contractor to re-work and re-model a rear garden to provide different seating areas and areas of privacy together with a new garden room with a meadow flower green roof, built in seating, raised planting beds and level changes on this sloping site whilst maintaining views out.

 

Wales

Early discussion underway to re-model and extend a tired mid 20th century bungalow to create a low energy development of interest with light and air and views out to the landscape.

 

Bath

Works are at an advanced stage to complete the building regulations details and drawings for a new link between a farmhouse and a converted dairy building. Photos of the previous works to extend the farmhouse and convert the dairy will posted on this website very soon.

 

 

 

 

We have many more projects to share with you and photos to post here. We've been gone a while but hope to soon bring everything up to date and show you what we can offer. Get in touch!

 

Find us also on Bark!

 

 

 

 

 

 

 

 

27 Trenchard St
Bristol 
BS1 5AN

 

t: 07967 726 477

e: info@dzarchitecture.com

 

Print Print | Sitemap
copyright dz architecture 2020